Part 1 of 2. Administration and Budgeting
|
| Section 1: General Administrative Information |
| Process Information: |
| Date Proposal Submitted & Finalized |
Status |
Form Generator |
| January 10, 2006 |
Finalized |
Lloyd Odell |
|
|
| Proposal Type: |
New |
| Proposal Number: |
200704400 |
| Proposal Name: |
Kettle River Tributaries Riparian Habitat Improvement Project |
| Agency, Institution or Organization: |
Ferry Conservation District |
| Short Description: |
Working in cooperation with the Colville National Forest, we will install off-stream water sources for livestock grazing on National Forest land in the northeast corner of Ferry County. This will improve water quality, and enhance upland game range. |
| Information Transfer: |
The IMP Subbasin Plan for the Upper Columbia notes excessive sedimentation and subsequent low dissolved oxygen levels as detrimental to native redband trout populations. By inducing range cattle to stay out of riparian areas, we will determine how much we can reduce sedimentation from stock traffic. We will assess water quality before and after project installations, and we will share the information with any agency that strives to balance fish habitat needs with other forest uses. |
| |
| Project Proposal Contacts |
| Contact |
Organization |
Address |
Phone/Email |
Roles |
Notes |
|
Form Submitter |
| Lloyd Odell |
Ferry Conservation District |
PO box 1045
Republic WA 99166 |
Ph: 509-775-3473
Fax: 509-775-3170
Email: lloyd-odell@wa.nacdnet.org |
Form Submitter |
Our agency played a significant role in the IMP subbasin planning process. We are seeking funding for improvement/maintenence projects in the San Poil or Upper/Mid-Columbia subbasins. |
|
All Assigned Contacts |
| Lloyd Odell |
Ferry Conservation District |
PO box 1045
Republic WA 99166 |
Ph: 509-775-3473
Fax: 509-775-3170
Email: lloyd-odell@wa.nacdnet.org |
Technical Contact
|
Our agency played a significant role in the IMP subbasin planning process. We are seeking funding for improvement/maintenence projects in the San Poil or Upper/Mid-Columbia subbasins. |
|
|
| Section 2: Project Location |
| Sponsor Province: |
Intermountain |
ARG Province: |
No Change |
| Sponsor Subbasin: |
Columbia Upper |
ARG Subbasin: |
No Change |
| Location(s) at which the action will be implemented |
| Latitude |
Longitude |
Waterbody |
Location Description |
County/State |
Subbasin |
Primary? |
| 485502
|
1182836
|
Day Creek |
Bardwell Springs |
Ferry, Washington |
Columbia Upper |
No |
| 485453
|
1181637
|
Little Boulder Creek |
Little Boulder Cutslope Repair |
Ferry, Washington |
Columbia Upper |
No |
| 485409
|
1182404
|
Lone Ranch Creek |
Lone Ranch Wetland |
Ferry, Washington |
Columbia Upper |
No |
| 485924
|
1182224
|
Manley Creek |
Manley Creek |
Ferry, Washington |
Columbia Upper |
No |
| 485307
|
1181327
|
Martin Creek |
Martin Creek |
Ferry, Washington |
Columbia Upper |
No |
| 485530
|
1183844
|
Stream |
Cottonwood Creek |
Ferry, Washington |
Columbia Upper |
Yes |
|
|
| Section 3: Focal Species |
| Focal Species: |
| Primary |
Secondary |
Additional Species |
Interior Redband Trout
|
All Wildlife
|
migratory neotropical songbirds, migratory waterfowl, riparian-dwelling mammals. |
|
|
| Section 4: Past Accomplishments |
| Past Accomplishments for Each Fiscal Year of This Project |
This proposal is for funding a new project, and has no past accomplishments.
|
|
| Section 5: Relationships to Other Projects |
| Other Current Projects Related to this Project (any funding source) |
There are no projects related to this proposal.
|
|
| Section 6: Biological Objectives |
| Biological Objectives of this Proposed Project |
| Biological Objective |
Full Description |
Associated Subbasin Plan |
Strategy |
Page Nos |
| Province Level Objective 2B |
Focus restoration efforts on habitats and functions that allow for expanding and maintaining diversity within and among species in order to sustain a system of robust populations in the face of environmental variation. |
Intermountain |
Same objectives as Objecive 1B. |
34-14 |
| Subbasin Level Objective 2A2 |
Maintain, restore and enhance wild populations of native fish... (priority 3). |
Intermountain |
a, |
34-13 |
| Subbasin Objective 1B2 |
Begin implementation of habitat strategies for addressing identified limiting factors for all focal species and native fishes by 2005 (Priority 1). |
Intermountain |
a, b, e, k |
34-9 |
| Subbasin Objective 1B6 |
Enhance, conserve and protect riparian habitats to the extent that 80% of each stream's riparian areas remain intact and functional (priority 9). |
Intermountain |
a, b, c, d, e |
34-10 |
| Subbasin Objective 1B7 |
Reduce width to depth ratios to <10 for all streams within the subbasin, as appropriate. |
Intermountain |
b, c, d |
34-10 |
|
|
| Section 7: Work Elements |
| Work Elements and Associated Biological Objectives |
| Work Element Name |
Work Element Title |
Description |
Start Date |
End Date |
Estimated Budget |
| Develop Alternative Water Source |
Water Trough Installation |
At three of our identified project sites (please refer to Sec. 10 narrative), we will install a total of 5 water troughs to provide alternative stock water sources. Troughs will have 1200 gallon capacity each. |
6/15/2007 |
10/1/2007 |
$13,500 |
| Biological Objectives |
Metrics |
|
No Metrics for this Work Element |
|
| Install Fence |
Riparian and Wetland Fencing |
At the five identified project sites (please see site descriptions in Section 10), we will install a total of 3.5 miles of fencing to limit cattle access to sensitive stream and wetland areas. |
9/15/2007 |
8/30/2008 |
$34,400 |
| Biological Objectives |
Metrics |
Province Level Objective 2B Subbasin Level Objective 2A2 Subbasin Objective 1B2 Subbasin Objective 1B6 Subbasin Objective 1B7
|
* # of miles of fence: 3.5
|
|
| Plant Vegetation |
Riparian/Wetland Vegetation Enhancement |
At all five project sites, we will restore and replant degraded vegetation. |
4/15/2008 |
5/15/2008 |
$12,800 |
| Biological Objectives |
Metrics |
|
* # of acres of planted: 12.8
|
|
| Upland Erosion and Sedimentation Control |
Little Boulder Creek Slope Stabilization |
To stabilize cut slopes, we will install brush fascines on 16-foot centers, perpendicular to the fall line of the slope. Hydromulch with grass seed. Above structure lines, plant Ponderosa Pine. Plant Black Cottonwood and quaking Aspen 1'-2' above waterline. Rebuild the existing fence. |
8/1/2007 |
5/30/2008 |
$4,500 |
| Biological Objectives |
Metrics |
|
* # of acres treated: 1.70
|
|
| Other |
Hardened Crossing Installlation |
At two of the identified project sites (please refer to narrative in Secction 10), we will construct hardened crossing points to lessen livestock impact. |
7/1/2007 |
10/1/2007 |
$5,000 |
| Biological Objectives |
Metrics |
|
No Metrics for this Work Element |
|
| Manage and Administer Projects |
Project Management and Administration |
Staff will develop work schedule, coordinate project implementation, and inspect finished projects, and submit any necessary progress reports. Administrative staff will be responsible for all billing, vouchering, accounting and financial reporting. |
11/1/2006 |
9/30/2009 |
$20,552 |
| Biological Objectives |
Metrics |
|
No Metrics for this Work Element |
|
| Outreach and Education |
Education and Outreach |
staff will conduct public education programs to explain the project to landowners and the general public. We will emphasize the coordinated efforts of the involved Federal, State and Local government agencies. Activities will include press releases, webpage articles and audio-visual displays at local conservation events. We will also usee the projects as subject matter for our continuing conservation education program in the schools within the Conservation District. |
11/1/2006 |
9/30/2009 |
$5,000 |
| Biological Objectives |
Metrics |
|
* # of general public reached: 5000 * # of students reached: 350 * # of teachers reached: 11
|
|
| Produce Inventory or Assessment |
Riparian Vegetation Assessment |
In conjunction with water quality monitoring, staff will also assess the baseline vegetation levels in the project areas, and measure the improvement. |
4/1/2007 |
9/15/2009 |
$2,300 |
| Biological Objectives |
Metrics |
|
No Metrics for this Work Element |
|
| Submit/Acquire Data |
Water Quality Monitoring |
Prior to starting any specific project, staff will collect water quality data for baseline assessments. After implementation, we will continue monitoring to assess changes in water quality. |
4/1/2007 |
9/15/2009 |
$3,200 |
| Biological Objectives |
Metrics |
|
No Metrics for this Work Element |
|
|
|
| Section 8: Budget |
|
| Itemized Estimated Budget |
| Item |
Note |
FY 2007 Cost |
FY 2008 Cost |
FY 2009 Cost |
| Personnel |
0.1 FTE Administration |
$2,870 |
$2,870 |
$2,870 |
| Fringe Benefits |
0.1 FTE Administration |
$636 |
$636 |
$636 |
| Personnel |
0.1 FTE Project Oversight |
$2,722 |
$2,722 |
$2,722 |
| Fringe Benefits |
0.1 FTE Project Oversight |
$613 |
$613 |
$613 |
| Personnel |
.3 FTE Project Specialist |
$4,255 |
$4,255 |
$4,255 |
| Fringe Benefits |
.3 FTE Project Specialist |
$1,181 |
$1,181 |
$1,181 |
| Travel |
1000 mi/month during work season |
$2,730 |
$2,730 |
$2,730 |
| Supplies |
Troughs, 1200 gal, 5ea |
$6,500 |
$ 0 |
$ 0 |
| Supplies |
Rock & gravel for various projects |
$6,000 |
$ 0 |
$ 0 |
| Supplies |
Bank Stabilization materials |
$2,800 |
$ 0 |
$ 0 |
| Supplies |
Trees & Shrubs |
$ 0 |
$8,000 |
$ 0 |
| Other |
Contracting -- Backhoe, trucks, |
$14,000 |
$4,000 |
$ 0 |
| Other |
Contract Labor |
$6,000 |
$5,000 |
$ 0 |
| Capital Equipment |
Digital Camera, 1/2 computer for record keeping, Densiometer |
$1,500 |
$ 0 |
$ 0 |
| Overhead |
Water monitoring supplies, paper, general overhead |
$810 |
$810 |
$810 |
| Totals |
$52,617 |
$32,817 |
$15,817 |
|
|
| Total Estimated FY 2007-2009 Budgets |
| Total Itemized Budget | $101,252 |
| Total Work Element budget | $101,252 |
|
|
| Cost sharing |
| Funding Source or Organization |
Item or Service Provided |
FY 2007 Est Value ($) |
FY 2008 Est Value ($) |
FY 2009 Est Value ($) |
Cash or in-kind? |
Status |
| Colville National Forest |
Project Coordination |
$2,889 |
$2,889 |
$2,889 |
In-Kind |
Confirmed |
| Colville National Forest |
Water Quality Monitoring |
$2,889 |
$2,889 |
$2,889 |
In-Kind |
Confirmed |
| Colville National Forest |
Project Standards and inspection |
$2,889 |
$2,889 |
$2,889 |
In-Kind |
Confirmed |
| USDA Job Corps |
Project Labor |
$3,000 |
$3,000 |
$1,500 |
In-Kind |
Under Review |
| Washington Department of Ecology |
Water Quality Monitoring |
$3,500 |
$3,500 |
$3,500 |
In-Kind |
Under Review |
| Totals |
$15,167 |
$15,167 |
$13,667 |
|
|
|
| Section 9: Project Future |
| Project Future Costs and/or Termination |
| FY 2010 Est Budget |
FY 2011 Est Budget |
Comments |
| $ 0 |
$ 0 |
[Outyear comment field left blank] |
| Future Operations & Maintenance Costs |
| Working with a start date in FY 2007, project will be completed, with one year of post-project monitoring, by 09/30/09. By this date, we will know the benefit to cost ratio for other riparian rehabilitation projects within the subbasin. |
| |
| Termination Date |
Comments |
| 09/30/09 |
The timetable we are using takes into account previous resource inventory work done by the Colville National Forest Fisheries Management Team. CNF will have NEPA documents for the treatment area in time to allow us to start work in FY 2007. Also, we will be ready to take on more work in FY 2010. |
| |
| Final Deliverables |
| 3.5 miles of riparian fence installed.
5 offsteam alternative water sources installed.
1.7 acres of streambank stabilized.
12.8 acres of riparian habitat restored.
6 presentations made in schools in the project area.
4 presentations made to general public. |
|
|
| Section 10: Narrative |
|
|
|
Part 2 of 2. Reviews of Proposal
|
| Administrative Review Group (ARG) Results |
Account Type:
Expense |
No changes were made to this proposal |
BPA's in lieu Funding Review of new project proposals (August 3, 2006)
[Download letter and table]
|
BPA's in lieu Rating: 1.0
Approx. BPA share of total costs: BPA 70%
Status of Cost Share: Confirmed
|
| Notes: Offstream water sources on NFS land for grazing mitigation; assume covered by FS MOU |
NPCC Final Funding Recommendations (October 23, 2006)
[Full NPCC Council Recs]
|
FY 2007 Budget $ 0 |
FY 2008 Budget $ 0 |
FY 2009 Budget $ 0 |
Total NPCC Rec $ 0 |
| Budget Type: | Expense |
| Budget Category: | ProvinceExpense |
| Recommendation: | Do Not Fund
|
| Comments: |
NPCC Draft Funding Recommendations (September 15, 2006)
[Full NPCC Council Recs]
|
FY 2007 Budget $ 0 |
FY 2008 Budget $ 0 |
FY 2009 Budget $ 0 |
Total NPCC Rec $ 0 |
FY 2007 MSRT Rec $ 0 |
FY 2008 MSRT Rec $ 0 |
FY 2009 MSRT Rec $ 0 |
Total MSRT Rec $ 0 |
| Budget Category: | ProvinceExpense |
| Comments: |
|
|
Independent Scientific Review Panel Final Review (August 31, 2006)
[Download full document]
|
| Recommendation: Not fundable
|
| NPCC Comments: This proposal lacks a narrative. In addition, some parts of the administrative/budget portion of the proposal were missing or deficient. As such the proposal must be disqualified. It is neither reviewable nor fundable. |
Independent Scientific Review Panel Preliminary Review (June 2, 2006)
[Download full document]
|
| Recommendation: Not fundable
|
| NPCC Comments: This proposal lacks a narrative. In addition, some parts of the administrative/budget portion of the proposal were missing or deficient. As such the proposal must be disqualified. It is neither reviewable nor fundable. |