FY 2007 Solicitation Homepage

Project Proposal Request for FY 2007 - FY 2009 Funding

Proposal 200704400: Kettle River Tributaries Riparian Habitat Improvement Project

Download this document in MS Word format
Open this document in PDF format

Table of Contents
Part 1. Administration and Budgeting
Section 1: General Administrative
Section 2: Project Location
Section 3: Project Species
Section 4: Past Accomplishments
Section 5: Relationship to Other Projects
Section 6: Biological Objectives
Section 7: Work Elements
Section 8: Budget
Section 9: Project Future
Section 10: Documents
Part 2. Reviews
Part 1 of 2. Administration and Budgeting
Section 1: General Administrative Information
Process Information:
Date Proposal Submitted & Finalized Status Form Generator
January 10, 2006 Finalized Lloyd Odell

Proposal Type: New
Proposal Number: 200704400
Proposal Name: Kettle River Tributaries Riparian Habitat Improvement Project
Agency, Institution or Organization: Ferry Conservation District
Short Description: Working in cooperation with the Colville National Forest, we will install off-stream water sources for livestock grazing on National Forest land in the northeast corner of Ferry County. This will improve water quality, and enhance upland game range.
Information Transfer: The IMP Subbasin Plan for the Upper Columbia notes excessive sedimentation and subsequent low dissolved oxygen levels as detrimental to native redband trout populations. By inducing range cattle to stay out of riparian areas, we will determine how much we can reduce sedimentation from stock traffic. We will assess water quality before and after project installations, and we will share the information with any agency that strives to balance fish habitat needs with other forest uses.
 
Project Proposal Contacts
Contact Organization Address Phone/Email Roles Notes
Form Submitter
Lloyd Odell Ferry Conservation District PO box 1045
Republic WA 99166
Ph: 509-775-3473
Fax: 509-775-3170
Email: lloyd-odell@wa.nacdnet.org
Form Submitter Our agency played a significant role in the IMP subbasin planning process. We are seeking funding for improvement/maintenence projects in the San Poil or Upper/Mid-Columbia subbasins.
All Assigned Contacts
Lloyd Odell Ferry Conservation District PO box 1045
Republic WA 99166
Ph: 509-775-3473
Fax: 509-775-3170
Email: lloyd-odell@wa.nacdnet.org
Technical Contact
Our agency played a significant role in the IMP subbasin planning process. We are seeking funding for improvement/maintenence projects in the San Poil or Upper/Mid-Columbia subbasins.

Section 2: Project Location
Sponsor Province: Intermountain ARG Province: No Change
Sponsor Subbasin: Columbia Upper ARG Subbasin: No Change
Location(s) at which the action will be implemented
Latitude Longitude Waterbody Location Description County/State Subbasin Primary?
485502 1182836 Day Creek Bardwell Springs Ferry, Washington Columbia Upper No
485453 1181637 Little Boulder Creek Little Boulder Cutslope Repair Ferry, Washington Columbia Upper No
485409 1182404 Lone Ranch Creek Lone Ranch Wetland Ferry, Washington Columbia Upper No
485924 1182224 Manley Creek Manley Creek Ferry, Washington Columbia Upper No
485307 1181327 Martin Creek Martin Creek Ferry, Washington Columbia Upper No
485530 1183844 Stream Cottonwood Creek Ferry, Washington Columbia Upper Yes

Section 3: Focal Species
Focal Species:
Primary Secondary Additional Species
Interior Redband Trout
All Wildlife
migratory neotropical songbirds, migratory waterfowl, riparian-dwelling mammals.

Section 4: Past Accomplishments
Past Accomplishments for Each Fiscal Year of This Project This proposal is for funding a new project, and has no past accomplishments.

Section 5: Relationships to Other Projects
Other Current Projects Related to this Project (any funding source) There are no projects related to this proposal.

Section 6: Biological Objectives
Biological Objectives of this Proposed Project
Biological Objective Full Description Associated Subbasin Plan Strategy Page Nos
Province Level Objective 2B Focus restoration efforts on habitats and functions that allow for expanding and maintaining diversity within and among species in order to sustain a system of robust populations in the face of environmental variation. Intermountain Same objectives as Objecive 1B. 34-14
Subbasin Level Objective 2A2 Maintain, restore and enhance wild populations of native fish... (priority 3). Intermountain a, 34-13
Subbasin Objective 1B2 Begin implementation of habitat strategies for addressing identified limiting factors for all focal species and native fishes by 2005 (Priority 1). Intermountain a, b, e, k 34-9
Subbasin Objective 1B6 Enhance, conserve and protect riparian habitats to the extent that 80% of each stream's riparian areas remain intact and functional (priority 9). Intermountain a, b, c, d, e 34-10
Subbasin Objective 1B7 Reduce width to depth ratios to <10 for all streams within the subbasin, as appropriate. Intermountain b, c, d 34-10

Section 7: Work Elements
Work Elements and Associated Biological Objectives
Work Element Name Work Element Title Description Start Date End Date Estimated Budget
Develop Alternative Water Source Water Trough Installation At three of our identified project sites (please refer to Sec. 10 narrative), we will install a total of 5 water troughs to provide alternative stock water sources. Troughs will have 1200 gallon capacity each. 6/15/2007 10/1/2007 $13,500
Biological Objectives Metrics
No Metrics for this Work Element

Install Fence Riparian and Wetland Fencing At the five identified project sites (please see site descriptions in Section 10), we will install a total of 3.5 miles of fencing to limit cattle access to sensitive stream and wetland areas. 9/15/2007 8/30/2008 $34,400
Biological Objectives Metrics
Province Level Objective 2B
Subbasin Level Objective 2A2
Subbasin Objective 1B2
Subbasin Objective 1B6
Subbasin Objective 1B7
* # of miles of fence: 3.5

Plant Vegetation Riparian/Wetland Vegetation Enhancement At all five project sites, we will restore and replant degraded vegetation. 4/15/2008 5/15/2008 $12,800
Biological Objectives Metrics
* # of acres of planted: 12.8

Upland Erosion and Sedimentation Control Little Boulder Creek Slope Stabilization To stabilize cut slopes, we will install brush fascines on 16-foot centers, perpendicular to the fall line of the slope. Hydromulch with grass seed. Above structure lines, plant Ponderosa Pine. Plant Black Cottonwood and quaking Aspen 1'-2' above waterline. Rebuild the existing fence. 8/1/2007 5/30/2008 $4,500
Biological Objectives Metrics
* # of acres treated: 1.70

Other Hardened Crossing Installlation At two of the identified project sites (please refer to narrative in Secction 10), we will construct hardened crossing points to lessen livestock impact. 7/1/2007 10/1/2007 $5,000
Biological Objectives Metrics
No Metrics for this Work Element

Manage and Administer Projects Project Management and Administration Staff will develop work schedule, coordinate project implementation, and inspect finished projects, and submit any necessary progress reports. Administrative staff will be responsible for all billing, vouchering, accounting and financial reporting. 11/1/2006 9/30/2009 $20,552
Biological Objectives Metrics
No Metrics for this Work Element

Outreach and Education Education and Outreach staff will conduct public education programs to explain the project to landowners and the general public. We will emphasize the coordinated efforts of the involved Federal, State and Local government agencies. Activities will include press releases, webpage articles and audio-visual displays at local conservation events. We will also usee the projects as subject matter for our continuing conservation education program in the schools within the Conservation District. 11/1/2006 9/30/2009 $5,000
Biological Objectives Metrics
* # of general public reached: 5000
* # of students reached: 350
* # of teachers reached: 11

Produce Inventory or Assessment Riparian Vegetation Assessment In conjunction with water quality monitoring, staff will also assess the baseline vegetation levels in the project areas, and measure the improvement. 4/1/2007 9/15/2009 $2,300
Biological Objectives Metrics
No Metrics for this Work Element

Submit/Acquire Data Water Quality Monitoring Prior to starting any specific project, staff will collect water quality data for baseline assessments. After implementation, we will continue monitoring to assess changes in water quality. 4/1/2007 9/15/2009 $3,200
Biological Objectives Metrics
No Metrics for this Work Element


Section 8: Budget

Itemized Estimated Budget
Item Note FY 2007 Cost FY 2008 Cost FY 2009 Cost
Personnel 0.1 FTE Administration $2,870 $2,870 $2,870
Fringe Benefits 0.1 FTE Administration $636 $636 $636
Personnel 0.1 FTE Project Oversight $2,722 $2,722 $2,722
Fringe Benefits 0.1 FTE Project Oversight $613 $613 $613
Personnel .3 FTE Project Specialist $4,255 $4,255 $4,255
Fringe Benefits .3 FTE Project Specialist $1,181 $1,181 $1,181
Travel 1000 mi/month during work season $2,730 $2,730 $2,730
Supplies Troughs, 1200 gal, 5ea $6,500 $ 0 $ 0
Supplies Rock & gravel for various projects $6,000 $ 0 $ 0
Supplies Bank Stabilization materials $2,800 $ 0 $ 0
Supplies Trees & Shrubs $ 0 $8,000 $ 0
Other Contracting -- Backhoe, trucks, $14,000 $4,000 $ 0
Other Contract Labor $6,000 $5,000 $ 0
Capital Equipment Digital Camera, 1/2 computer for record keeping, Densiometer $1,500 $ 0 $ 0
Overhead Water monitoring supplies, paper, general overhead $810 $810 $810
Totals $52,617 $32,817 $15,817

Total Estimated FY 2007-2009 Budgets
Total Itemized Budget$101,252
Total Work Element budget$101,252

Cost sharing
Funding Source or Organization Item or Service Provided FY 2007 Est Value ($) FY 2008 Est Value ($) FY 2009 Est Value ($) Cash or in-kind? Status
Colville National Forest Project Coordination $2,889 $2,889 $2,889 In-Kind Confirmed
Colville National Forest Water Quality Monitoring $2,889 $2,889 $2,889 In-Kind Confirmed
Colville National Forest Project Standards and inspection $2,889 $2,889 $2,889 In-Kind Confirmed
USDA Job Corps Project Labor $3,000 $3,000 $1,500 In-Kind Under Review
Washington Department of Ecology Water Quality Monitoring $3,500 $3,500 $3,500 In-Kind Under Review
Totals $15,167 $15,167 $13,667

Section 9: Project Future
Project Future Costs and/or Termination
FY 2010 Est Budget FY 2011 Est Budget Comments
$ 0 $ 0 [Outyear comment field left blank]
Future Operations & Maintenance Costs
Working with a start date in FY 2007, project will be completed, with one year of post-project monitoring, by 09/30/09. By this date, we will know the benefit to cost ratio for other riparian rehabilitation projects within the subbasin.
 
Termination Date Comments
09/30/09 The timetable we are using takes into account previous resource inventory work done by the Colville National Forest Fisheries Management Team. CNF will have NEPA documents for the treatment area in time to allow us to start work in FY 2007. Also, we will be ready to take on more work in FY 2010.
 
Final Deliverables
3.5 miles of riparian fence installed. 5 offsteam alternative water sources installed. 1.7 acres of streambank stabilized. 12.8 acres of riparian habitat restored. 6 presentations made in schools in the project area. 4 presentations made to general public.

Section 10: Narrative
Document Type Size Date
Narrative for proposal 200704400 doc 44 kb 1/10/2006

Part 2 of 2. Reviews of Proposal
Administrative Review Group (ARG) Results
Account Type:
Expense
No changes were made to this proposal


BPA's in lieu Funding Review of new project proposals (August 3, 2006) [Download letter and table]

BPA's in lieu Rating: 1.0
Approx. BPA share of total costs: BPA 70%
Status of Cost Share: Confirmed
Notes: Offstream water sources on NFS land for grazing mitigation; assume covered by FS MOU


NPCC Final Funding Recommendations (October 23, 2006) [Full NPCC Council Recs]

FY 2007 Budget
$ 0
FY 2008 Budget
$ 0
FY 2009 Budget
$ 0
Total NPCC Rec
$ 0
Budget Type:Expense
Budget Category:ProvinceExpense
Recommendation:Do Not Fund
Comments:


NPCC Draft Funding Recommendations (September 15, 2006) [Full NPCC Council Recs]

FY 2007 Budget
$ 0
FY 2008 Budget
$ 0
FY 2009 Budget
$ 0
Total NPCC Rec
$ 0
FY 2007 MSRT Rec
$ 0
FY 2008 MSRT Rec
$ 0
FY 2009 MSRT Rec
$ 0
Total MSRT Rec
$ 0
Budget Category:ProvinceExpense
Comments:


Independent Scientific Review Panel Final Review (August 31, 2006) [Download full document]

Recommendation: Not fundable
NPCC Comments: This proposal lacks a narrative. In addition, some parts of the administrative/budget portion of the proposal were missing or deficient. As such the proposal must be disqualified. It is neither reviewable nor fundable.


Independent Scientific Review Panel Preliminary Review (June 2, 2006) [Download full document]

Recommendation: Not fundable
NPCC Comments: This proposal lacks a narrative. In addition, some parts of the administrative/budget portion of the proposal were missing or deficient. As such the proposal must be disqualified. It is neither reviewable nor fundable.

Maintained by the Columbia Basin Fish & Wildlife Authority. Please direct comments or questions to the webmaster.